Every day we're getting a little bit closer to completion. All interior doors are on site and have been stained. These are single panel, solid maple doors that will look and feel great for a long, long time. Interior trim on the first floor has been either primed for enameling or stripped to accept staining. Most of the baseboard will be enameled, while the window trim will be stained to match the new cabinetry. The end result will provide consistency throughout. Our hope is that the flow will be natural and the addition will feel as if it's always been part of the house.
The cabinetry has been stained and the countertops have been set. Plumbing to the sink and dishwasher has been connected. Appliances are due to be installed this week! Once these are in we'll nearly have a fully functioning kitchen.
Painting, carpeting, other flooring, electrical fixtures, plumbing fixtures and just a few other details remain. Hopefully the majority of the work will be wrapped up by the 4th of July holiday. Good luck everyone!
No comments:
Post a Comment