The prefabricated roof trusses have been set on the new 8'-0" second floor walls. All the rough openings have been measured and framed for exterior windows. The skylight in the bathroom was considered when manufacturing the truss design so only the rough opening will have to be adjusted.
The existing roof is still mostly intact, but will be removed once the framing and sheathing is in place.