Friday, August 27, 2010

Cabinetry and Floors

The kitchen and bathroom cabinetry was installed at the end of last week along with the new wood floors on the main level. The cabinets look great! They will be stained this week and the doors and drawers will be hung with soft closing hardware.
The kitchen has a much different feel now that the cabinets and hood have been installed. It's safe to say that cooking will be an absolute joy in this new space!

The color of the new wood floor will be selected early this week. Once the selection is made all the existing floors on the main level will be refinished to provide continuity throughout. Baseboards, window trim and door trim will also be refinished or replaced for consistency.

All doors have been hung and are awaiting either stain or paint. Most doors and windows have been trimmed, but a few still remain. Baseboard is complete in the main bedroom upstairs and the rest of the rooms will follow. The stair railing and banister has been installed, which gives shape to the family room upstairs.

Natural light pours through the south facing windows and sun tunnels to brighten the house. There won't be too many days when artificial lighting is needed. Surface mounted fixtures and pendants have not yet been installed, but all recessed lighting is operational.

Stucco and exterior details are next!

No comments: